NEWS CENTER

Clinker bulk machine installation points to explain, not to be missed


Release time:

Jan 27,2021

Clinker bulk machine is the cement plant clinker loading or loading special distribution equipment, clinker bulk machine with automatic positioning automatic tracking material level detection, low energy consumption, smooth unloading, loading capacity, dust-free loading, loading and other characteristics. It can be installed at the bottom of the warehouse directly for the bulk distribution of cars and trains, or at the middle or end of the conveying equipment for loading or loading.

clinkerbulk machineIt is a special distribution equipment for cement plant clinker loading or loading. The clinker bulk machine has the characteristics of automatic positioning, automatic tracking of material level detection, low energy consumption, smooth unloading, large loading capacity, dust-free loading, loading and so on. It can be installed at the bottom of the warehouse directly for the bulk distribution of cars and trains, or at the middle or end of the conveying equipment for loading or loading.

clinkerbulk machineIt is composed of manual rod valve, upper limit limit device, electric lifting and hoisting device, pneumatic arc valve, automatic positioning loose rope switch device, feeding device, sleeve type telescopic bulk blanking head automatic tracking material level detector and special electric control cabinet, etc. It is easy to install and maintain.

On the clinker bulk machine installation points to explain:

(1) Installation of main components

The installation position of the main components shall be as shown in the process drawing. In addition, the cement clinker shall be installed.bulk machineAt the warehouse side, gaskets should be added between the components. To prevent excessive external air into the dust collection system and affect the dust collection effect.

(2) Rolling device and bulk blanking head

During installation, the winding device and the blanking sleeve are respectively fixed at their respective installation positions. Then bypass the wire rope between the crown block and the movable pulley respectively, and then tighten the wire rope led up and fixed on the frame on the OO-type rigging ring hook.

(3) Material level tracking detector

The signal cable must be spirally guided from the fixing sleeve on the dust collection telescopic sleeve. And to ensure that no knot is tied during the lifting of the dust collection telescopic sleeve. The installation of the signal switch is determined after manual simulation. The anti-malfunction mechanical damping device must be firmly connected to avoid falling off during use.

(4) Electrical control system

Strictly in accordance with the various models of sleeve clinkerbulk machineThe electric control schematic diagram connects the control line and the power line. The non-electrified equipment shell, metal screen cover and platform must be safely grounded.