It is a very important and regular job to maintain the machinery during factory production. The installation and maintenance of the vibrating hoist should be checked by staff on duty. For example, the bearing of the hoist should be able to bear the full load of the whole machinery. Therefore, the frequent lubrication of the vibrating hoist is greatly related to the life of the bearing.

In the factory production of mechanical maintenance is a very important and regular work, the vibrationHoistFor installation and maintenance, there should be staff on duty inspection. For example, the bearing of the hoist should be able to bear the full load of the whole machine. Therefore, frequent lubrication of the vibration hoist is greatly related to the life of the bearing. The existence of the bearing will directly affect the service life and operation rate of the machine, so the lubricating oil injected into the bearing must be clean and well sealed during the lubrication of the hoist. The steps that need to be lubricated in the vibrating hoist include all gears, rotating bearings, movable bearings, sliding planes, and the contours of the vibrating hoist where the roller bearing has just been installed are often loose, so it needs to be checked frequently.

In addition, the staff should check whether each part of the hoist is normal and check the wear degree of the components that are easy to wear. If excessive wear occurs, it should be replaced. The bottom frame plane placed under the movable device should be swept away from dust to prevent the movable bearing from moving freely on the bottom frame when the hoist encounters some large materials, thus causing some serious accidents. If the oil temperature of the hoist shaft rises rapidly, the equipment should be stopped to check the corresponding reason and eliminate it before it can continue to work. If there is an impact sound in the rotating gear during the work, the operation should be stopped for inspection, and the cause should be found out before the vibration hoist can be used.

The vibration hoist is generally installed on the horizontal concrete ground and fixed with anchor bolts. During the installation, attention should be paid to the vertical degree between the equipment and the horizontal ground. After the installation, the staff need to check whether the spiral of each part of the vibration hoist has impulse and whether the hatch of the main engine has been fastened. Then check the power supply line and control switch of the hoist. After the inspection, test run with no load, it can be put into production only when the test run is normal.

The hoist consists of a running part (hopper and traction belt), an upper section with a driving roller, a lower section with a tightening roller, an intermediate casing, a driving device, a backstop braking device, etc. It is suitable for conveying powdery, granular and small pieces of non-grinding and semi-grinding bulk materials, such as coal, sand, coke, cement, crushed ore, etc. The shaft reducer is directly installed on the shaft head of the main shaft, eliminating the transmission platform, coupling, etc., making the structure compact and light in weight, and its internal backstop with a special-shaped roller, which is reliable. The reducer has low noise and smooth operation.